EVA Air outlines Boeing 787-9 schedule in November 2018
EVA Air opened reservation for its planned Boeing 787-9 aircraft, currently for the month of November 2018. The 787-9 is scheduled to operate Taipei Taoyuan – Hong Kong route, initially 2 daily, increasing to up to 4 daily. Planned 787-9 operation will be as follows:- 01 NOVEMBER 2018 BR867/868, BR857/858 02 NOVEMBER 2018 – 04 NOVEMBER 2018 BR891/892, BR855/856 05 NOVEMBER 2018 – 30 NOVEMBER 2018 BR891/892, BR851/852, BR855/856, BR871/872
All information posted is at the best of our knowledge and is subject to changes